Cover assembly and electrical connector assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871328
SERIAL NO

15412588

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector assembly having a cover assembly housing a first electrical component and a second electrical component. The cover assembly includes a mating connector receiving recess, a first component receiving recess and a second component receiving recess. A separating wall mechanically and electrically separates the first component receiving recess from the second component receiving recess. Latches are positioned in the first and second component receiving recess proximate the mating connector receiving recess. The latches cooperate with the electrical components to maintain the electrical component in the component receiving recesses. A seal is provided about an inside perimeter of the mating connector receiving recess. Bus bars electrically connect the first electrical component to the second electrical component. Wherein when the cover assembly is mated to the mating connector, a sealed compartment is provided that protects the first electrical components and the second electrical components from the environment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TYCO ELECTRONICS BRASIL LTDABRAZIL ST PAUL SAO PAULO SAO PAULO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Leme, Rafael Kazuo Sato Toledo Braganca Paulista, BR 2 1
Lopes, Ednei Braganca Paulista, BR 8 74
Santos, Natanael Marcondes Braganca Paulista, BR 4 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00