Porous electrode substrate, method for manufacturing same, membrane electrode assembly, polymer electrolyte fuel cell, precursor sheet, and fibrillar fibers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871257
SERIAL NO

13980774

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a porous electrode substrate having excellent thickness precision, gas permeability and conductivity, handling efficiency, low production costs and a high carbonization rate during carbonization. Also provided are a method for manufacturing such a substrate, a precursor sheet and fibrillar fiber used for forming such a substrate, along with a membrane electrode assembly and a polymer electrolyte fuel cell that contain such a substrate. The method for manufacturing a porous electrode substrate includes step (1) for manufacturing a precursor sheet in which short carbon fibers (A) and carbon fiber precursor (b) are dispersed, and step (2) for carbonizing the precursor sheet, and the volume contraction rate of carbon fiber precursor (b) in step (2) is 83% or lower. The present invention also relates to a porous electrode substrate obtained by such a manufacturing method, a precursor sheet and fibrillar fiber used for forming the substrate, along with a membrane electrode assembly and a polymer electrolyte fuel cell containing the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI CHEMICAL CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sako, Yoshihiro Hiroshima, JP 21 73
Sumioka, Kazuhiro Aichi, JP 20 90
Tanoue, Shigeru Hiroshima, JP 3 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00