Spacer assisted ion beam etching of spin torque magnetic random access memory

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871195
SERIAL NO

15465644

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A stack of MTJ layers is provided on a substrate comprising a bottom electrode, a pinned layer, a tunnel barrier layer, a free layer, and a top electrode. The MTJ stack is patterned to form a MTJ device wherein sidewall damage is formed on its sidewalls. A dielectric spacer is formed on the MTJ device. The dielectric spacer is etched away on horizontal surfaces wherein the dielectric spacer on the sidewalls is partially etched away. The remaining dielectric spacer covers the pinned layer and bottom electrode. The dielectric spacer is removed from the free layer or is thinner on the free layer than on the pinned layer and bottom electrode. Sidewall damage is thereafter removed from the free layer by applying a horizontal etching to the MTJ device wherein the pinned layer and bottom electrode are protected from etching by the dielectric spacer layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY LTD8 LI-HSIN RD 6 HSINCHU SCIENCE PARK HSINCHU 300-78

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shen, Dongna San Jose, US 64 320
Wang, Yu-Jen San Jose, US 264 2926
Yang, Yi Fremont, US 315 8219

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00