Semiconductor device with suppressed decrease in breakdown voltage of an insulation film and manufacturing method of the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871098
SERIAL NO

15516837

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device may include a semiconductor substrate in which a semiconductor element is provided, and an insulation film provided on the semiconductor substrate, in which the semiconductor substrate may include a first portion and a second portion which has a thickness thinner than a thickness of the first portion, an upper surface of the second portion may be positioned lower than an upper surface of the first portion, a recess extending in a thickness direction of the semiconductor substrate may be provided on the upper surface of the second portion located at a position where the first portion and the second portion adjoin to each other, and the insulation film may extend over from the first portion to the second portion, and fill the recess.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoi, Sachiko Nagakute, JP 55 387
Mizuno, Shoji Okazaki, JP 42 563
Onogi, Atsushi Toyota, JP 15 59
Saito, Jun Toyota, JP 224 1968

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00