Commutation cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871025
SERIAL NO

15308287

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A commutation cell having at least one electrical capacitor, at least one controllable semiconductor switch and at least one semiconductor which is connected in series with the controllable semiconductor switch. The commutation cell has three circuit substrates situated in parallel with one another. The controllable semiconductor switch is connected in series with the semiconductor via a circuit substrate situated partially between the controllable semiconductor switch and the semiconductor, and the two remaining circuit substrates being connected to one another in an electrically conductive manner via a subassembly made up of the controllable semiconductor switch, the semiconductor and the circuit substrate situated partially between the controllable semiconductor switch and the semiconductor, the electrical capacitor being switched between the two remaining circuit substrates, separately from the subassembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBHSTUTTGART GERMANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daves, Walter Singapore, SG 5 11
Duernsteiner, Silvia Marbach A.N., DE 1 0
Guenther, Michael Stuttgart, DE 14 79
Kasper, Knut Alexander Leonberg, DE 1 0
Rittner, Martin Freiberg, DE 18 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00