Power field-effect transistor (FET), pre-driver, controller, and sense resistor integration for multi-phase power applications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9870984
SERIAL NO

14965697

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques are described for integrating power field-effect transistors (FETs), pre-drivers, controllers, and/or resistors into a common multi-chip package for implementing multi-phase bridge circuits. The techniques may provide a multi-chip package with at least two high-side (HS) FETs and at least two low-side (LS) FETs, and place the at least two HS FETs or the at least LS FETs on a common die. Placing at least two FETs on a common die may reduce the number of die and the number of thermal pads (i.e., die pads) needed to implement a set of power FETs, thereby decreasing component count of a multi-phase bridge circuit and/or allowing a more compact, higher current density multi-phase bridge circuit to be obtained without significantly increasing thermal power dissipation of the circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXAS INSTRUMENTS INCORPORATED12500 TI BOULEVARD MS 3999 DALLAS TX 75243

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ranmuthu, Indumini Plano, US 31 134

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00