InGaAs film grown on Si substrate and method for preparing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9870918
SERIAL NO

15026726

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention discloses an InGaAs film grown on a Si substrate, which comprises a Si substrate, a low temperature In0.4Ga0.6As buffer layer, a high temperature In0.4Ga0.6As buffer layer and an In0.53Ga0.47As epitaxial film, arranged sequentially, wherein the low temperature In0.4Ga0.6As buffer layer is an In0.4Ga0.6As buffer layer grown at the temperature of 350˜380° C.; the high temperature In0.4Ga0.6As buffer layer is an In0.4Ga0.6As buffer layer grown at the temperature of 500˜540° C., and the sum of the thickness of the low temperature In0.4Ga0.6As buffer layer and the thickness of the high temperature In0.4Ga0.6As buffer layer is 10˜20 nm. The invention further discloses a method for preparing the InGaAs film. The InGaAs film grown on the Si substrate of the present invention has good crystal quality, is almost completely relaxed, and has a simple preparation process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOUTH CHINA UNIVERSITY OF TECHNOLOGY510635 WUSHAN ROAD TIANHE DISTRICT GUANGZHOU CITY GUANGDONG PROVINCE GUANGZHOU CITY GUANGDONG PROVINCE 510635

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, Fangliang Guangzhou, CN 3 1
Guan, Yunfang Guangzhou, CN 1 1
Li, Guoqiang Guangzhou, CN 103 519
Li, Jingling Guangzhou, CN 6 13
Wen, Lei Guangzhou, CN 25 43
Zhang, Shuguang Guangzhou, CN 85 1858

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00