Methods of coating an electrically conductive substrate and related electrodepositable compositions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9870844
SERIAL NO

14831047

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing an electrode for a lithium ion battery is disclosed in which an electrically conductive substrate is immersed into an electrodepositable composition, the substrate serving as the electrode in an electrical circuit comprising the electrode and a counter-electrode immersed in the composition, a coating being applied onto or over at least a portion of the substrate as electric current is passed between the electrodes. The electrodepositable composition comprises: (a) an aqueous medium; (b) an ionic (meth)acrylic polymer; and (c) solid particles comprising: (i) lithium-containing particles, and (ii) electrically conductive particles, wherein the composition has a weight ratio of solid particles to ionic (meth)acrylic polymer of at least 4:1.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PPG INDUSTRIES OHIO INC3800 WEST 143RD STREET CLEVELAND OH 44111

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daughenbaugh, Randy E Monroeville, US 35 221
Hellring, Stuart D Pittsburgh, US 111 1117

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00