Display panel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9870756
SERIAL NO

14644977

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A display panel including a pixel array and a gate driver circuit is provided. The pixel array has a plurality of pixels. The gate driver circuit is used for providing a plurality of gate signals to the pixels and includes a plurality of shift registers and a plurality of demultiplexers. The shift registers respectively receive a first gate signal of the gate signals and a first clock signal of a plurality of clock signals to respectively provide a first control signal and a second control signal. The demultiplexers respectively receive a plurality of second clock signals of the clock signals, respectively turn-on according to the first control signal provided by the corresponding one of the shift registers, and respectively cut-off according to the second control signal provided by the corresponding one of the shift registers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHUNGHWA PICTURE TUBES LTD1127 HEPING RD BADE CITY TAOYUAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yi-Kai Tainan, TW 26 126
Chen, Ying-Hui Taoyuan, TW 14 85
Huang, Yen-Yu Taoyuan, TW 36 72
Liu, En-Chih Taoyuan, TW 10 53
Tsai, Chi-Chung Kinmen County, TW 18 117

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00