Graphic processing unit and method of performing, by graphic processing unit, tile-based graphics pipeline

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9870639
SERIAL NO

14791626

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Computing apparatus and methods are provided for performing a tile-based graphics pipeline. The graphics pipeline includes a binning pipeline configured to generate a tile list of objects indicating which tile vertices, primitives, or patches the objects belong to; and a rendering pipeline configured to render an object, per tile, based on the tile list generated in the binning pipeline. Each of the binning pipeline and the rendering pipeline is configured to implement a tessellation pipeline. The graphics pipeline may be configured to operate in an efficiency mode to defer or lower tessellation by performing tessellation in one of the binning and rendering pipelines or by setting a new lower tessellation factor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chung, Mookyoung Hwaseong-si, KR 2 30
Jung, Seokyoon Seoul, KR 15 131
Park, Jeongae Seoul, KR 14 124
Ryu, Soojung Hwaseong-si, KR 40 241
Varadarajan, Keshavan Karnatake, IN 14 85

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00