Coating device, method of manufacturing display substrate using the same and display substrate manufactured using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9869895
SERIAL NO

14037929

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A coating device includes an upper stage, a lower stage and a spraying part. The upper stage masks an upper surface of a display panel. The lower stage masks a lower surface of the display panel. The spraying part sprays ink to a side surface of the display panel. The side surface of the display panel is exposed between the upper stage and the lower stage. The coating device includes the upper stage and the lower stage, so that the coating device may form a coating layer of uniform thickness by precisely spraying ink. In addition, a cross-section of the coating layer may be precisely formed having specific shape such as an L or C shape. A display apparatus having high light usage efficiency and reduced light leakage may be provided by using the coating device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG DISPLAY CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hong, Jung-Min Chungcheongbuk-do, KR 3 7
Jin, Ki-Su Daegu, KR 3 7
Kim, Min-Sung Suwon-si, KR 86 639
Lee, Seok-Ho Hwaseong-si, KR 13 103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00