Optical interposer for waveguides

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9869829
APP PUB NO 20140363122A1
SERIAL NO

14467721

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for preparing a subassembly, the process comprising (a) defining the location of one or more grooves for receiving at least one polymer waveguide in a wafer, (b) etching the grooves into the wafer, each groove having sidewalls and a first facet at the terminal end perpendicular to the side walls, the first facet having a first angle relative to the top planar surface, (c) coating the first facet with a reflective material, and (d) disposing a fluid polymer waveguide precursor into each groove, and writing a core into the polymer material by directing at least one laser beam on the first facet by directing the laser beam into the top of the polymer material such that the beam reflects off of the first facet and down the interior of the polymer material to form the core in the polymer waveguide.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TE CONNECTIVITY SOLUTIONS GMBHMUEHLENSTRASSE 26 SCHAFFHAUSEN 8200

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bowen, Terry Patrick Dillsburg, US 24 264
Rietveld, Jan Willem Benschop, NL 38 507

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00