Predictive control of a change-of-mind-shift maneuver

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9869387
SERIAL NO

14818917

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes a torque converter having a turbine, a transmission having friction clutches and an input member connected to the turbine, and a controller. The controller is programmed to control a change-of-mind shift maneuver of the transmission. By executing a method, the controller detects the change-of-mind shift maneuver, predicts an acceleration profile of the turbine for a next-requested shift of the detected shift maneuver as a function of a calibrated desired shift time and an output speed of the transmission, calculates a shift control value for a next-requested shift of the shift maneuver using the predicted acceleration profile, and executes the next-requested shift via the clutches using the calculated shift control value. The shift maneuver may be a skip-at-sync quick shift-to-quick shift or power downshift-to-power downshift. The shift value may be a clutch pressure for an offgoing holding clutch or a torque management level from an engine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 MAIL CODE 482-C23-B21 DETROIT MI 48265-3000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fiore, Brian H Waterford, US 8 13
Horgan, Jeremy V Northville, US 9 57
Monajemi, Dara Lansing, US 10 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00