Planetary gear train of automatic transmission for vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9869376
SERIAL NO

15333737

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A planetary gear train of an automatic transmission for a vehicle may include an input shaft receiving torque of an engine, an output shaft outputting changed torque of the engine, a first planetary gear set including a first rotation element, a second rotation element, and a third rotation element, a second planetary gear set including a fourth rotation element, a fifth rotation element, and a sixth rotation element, a third planetary gear set including a seventh rotation element, an eighth rotation element, and a ninth rotation element, a fourth planetary gear set including a tenth rotation element, an eleventh rotation element, and a twelfth rotation element, and first, second, third, fourth, fifth, sixth and seventh rotation shafts, each connected to at least one of the first to twelfth rotation elements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYUNDAI MOTOR COMPANY12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Wonmin Hwaseong-si, KR 268 1349
Hwang, Seong Wook Gunpo-si, KR 374 1848
Ji, Seongwook Gunpo-si, KR 285 1290
Kook, Jae Chang Hwaseong-si, KR 310 1295
Kwon, Hyun Sik Seoul, KR 253 1041

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00