Air-bag

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9868412
APP PUB NO 20160368448A1
SERIAL NO

14901908

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is an air-bag integrally formed by hollow weaving and including a control seam for restricting expansion. The control seam is extended from the base fabric on one surface of an expansion portion of the air-bag to the base fabric on another surface, and the base fabrics are joined. The control seam extending from the base fabric on the one surface to the base fabric on the other surface, and the control seam extending symmetrically from the base fabric on the other surface to the base fabric on the one surface constitute a pair of control seams One or more pairs of the restriction yarns are arranged in a block shape, forming a restriction yarn block. Adjacent restriction yarn blocks are disposed in a parallelly staggered manner with respect to the direction in which the restriction yarns extend.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMISHO AIRBAG SYSTEMS CO LTDNAGASAKI 859-4536

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takemoto, Tadashi Matsuura, JP 106 989
Yoshida, Masatoshi Matsuura, JP 99 875

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00