Composite device and switching power supply

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9866214
SERIAL NO

15305014

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention provides a composite device and a switching power supply. The composite device integrates therein a first enhancement-mode MOS device and a depletion-mode MOS device, and comprises: an epitaxial region of a first doping type; a first well region and a second well region formed in parallel on the front side of the epitaxial region; a first doped region of the first doping type formed within the first well region; a gate of the first enhancement-mode MOS device; a second doped region of the first doping type formed within the second well region; a channel region of the first doping type, wherein the channel region extends from a boundary of the second well region to a boundary of the second doped region; and a gate of the depletion-mode MOS device. The switching power supply includes the composite device above. This invention can decrease the process complexity, reduce the chip area and cost, and may be applicable to high power scenarios.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HANGZHOU SILAN MICROELECTRONICS CO LTD310012 NO 4 HUANG SHAN ROAD ZHEJIANG HANGZHOU HANGZHOU CITY ZHEJIANG PROVINCE 310012

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhang, Shaohua Zhejiang, CN 42 169

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00