AC/DC power converting apparatus with AC source shortcircuiting for power factor correction and harmonic suppression

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9866140
SERIAL NO

15501528

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power converting apparatus includes a rectifier that converts alternating-current power from an alternating-current power supply into direct-current power, a short-circuit unit that short-circuits the alternating-current power supply via a reactor, and a control unit that controls a short-circuit operation of the short-circuit unit. The control unit changes the number of times of the short-circuit operation during a half cycle of the alternating-current power supply on the basis of a load condition and sets a period from a start to an end of the short-circuit operation during the half cycle of the alternating-current power supply after the change of the number of times of the short-circuit operation to be different from a period from a start to an end of the short-circuit operation during the half cycle of the alternating-current power supply before the change of the number of times of the short-circuit operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arisawa, Koichi Tokyo, JP 100 265
Higashikawa, Tomomi Tokyo, JP 7 38
Takayama, Yuji Tokyo, JP 31 124
Tanikawa, Makoto Tokyo, JP 14 155
Umehara, Shigeo Tokyo, JP 26 113
Yamakawa, Takashi Tokyo, JP 77 504

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00