Transitioning a power supply from a mode to another mode in response to a length of a portion of a current pulse

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9866114
SERIAL NO

14479112

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An embodiment of a power-supply controller includes a switching circuit and a transition circuit. The switching circuit is configured to generate a regulated output voltage by generating first current pulses at an approximately fixed frequency during a first mode, and generating second current pulses at a variable frequency during a second mode. And the transition circuit is configured to transition the switching circuitry from the first mode to the second mode in response to a length of one of the first current pulses. For example, a power supply may include such a power-supply controller to transition the supply from a PWM mode to a PFM mode under light-load conditions. To cause this transition at a predictable load point, the controller may monitor the lengths of the current pulses during the PWM mode, and may transition the supply to a PFM mode in response to the lengths being below a threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERSIL AMERICAS LLC1001 MURPHY RANCH ROAD MILPITAS CA 95035

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Archibald, Nicholas San Francisco, US 8 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00