Regulated charge pump circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9866111
SERIAL NO

15198802

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Aspects of the disclosure provide a circuit for providing a power supply. The circuit includes a control signal generator circuit and a switch network circuit. The control signal generator circuit is configured to generate a control signal with a voltage level that is a function of an output voltage on a load capacitor. The switch network circuit is coupled with the load capacitor and a flying capacitor to form a charge pump circuit. The switch network circuit is configured to charge the flying capacitor in a charge stage and pump the flying capacitor in a pump stage to generate the output voltage on the load capacitor. The switch network circuit is configured to provide a pump control voltage to the flying capacitor during the pump stage. The pump control voltage has a voltage level that is adjusted based on the control signal to maintain the output voltage to be stable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARVELL ASIA PTE LTDTAI SENG CENTRE 3 IRVING ROAD #10-01 SINGAPORE 369522

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Yifeng San Jose, US 29 790
Qian, Wenrong Shanghai, CN 3 9
Wang, Yongxu Shanghai, CN 4 10
Zhao, Xiaoxiao Shanghai, CN 4 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00