Power supply apparatus with extending hold up time function

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9866106
SERIAL NO

15013237

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply apparatus includes a bulk capacitor, a voltage dropper unit and a pre-charging capacitor. The voltage dropper unit is electrically connected to the bulk capacitor. The pre-charging capacitor is electrically connected to the voltage dropper unit. When the power supply apparatus receives an input direct current voltage, a voltage of the bulk capacitor is provided with a first voltage, and the pre-charging capacitor is charged so that the pre-charging capacitor is provided with a second voltage, and the second voltage is greater than the first voltage. When the voltage of the bulk capacitor is less than a predetermined voltage, the second voltage of the pre-charging capacitor is converted voltage by the voltage dropper unit to provide for extending a hold up time of the power supply apparatus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DELTA ELECTRONICS INCNO 16 TUNGYUAN ROAD CHUNGLI INDUSTRIAL ZONE TAOYUAN CITY 320023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Yi-Sheng Taoyuan County, TW 12 22
Hsu, Cheng-Chan Taoyuan County, TW 4 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00