Fault-tolerant power distribution systems for a modular power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9866063
SERIAL NO

15091408

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Fault-tolerant power distribution systems for modular power plants are discussed. The systems enable the transmission of a portion of the power generated by a modular power plant to remote consumers. The systems also enable the local distribution of another portion of the generated power within the power plant. The various fault-tolerant systems enable the plant to continuously, and without degradation or disruption, transmit power to remote consumers and distribute power within in the power plant in the event of one or more faults within the distribution system. The various embodiments include redundant power-transmission paths, power-distribution module feeds, switchgear, and other hardware components. Such redundant transmission paths and hardware enable the systems to continuously, and without degradation or disruption, transmit power to remote consumers and locally distribute power to the power plant when one or more faults occur within one or more of the redundant power-transmission paths and/or hardware components.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUSCALE POWER LLC1100 NE CIRCLE BLVD SUITE 200 CORVALLIS OR 97330

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hough, Ted Corvallis, US 8 76

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00