Battery system and method for connecting a battery to the battery system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865901
SERIAL NO

14539867

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery system and method for connecting a battery to the battery system are disclosed. In one aspect, the battery system includes at least one first battery, a second battery, a first switch configured to connect the second battery in parallel to the first battery and a second switch and a resistor connected in series and configured to connect the second battery in parallel to the first battery. The first switch and the second switch are connected in parallel. The battery system further includes a battery management system (BMS) configured to turn on the second switch so as to connect the second battery to the first battery. The BMS is further configured to turn off the second switch and turn on the first switch when the difference in voltage between the second battery and the first battery reaches a predetermined value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG SDI CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hwang, Eui-Jeong Yongin-si, KR 39 275

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00