Stacked electrochemical cell with increased energy density

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865897
SERIAL NO

14293182

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrochemical cell assembly (500) includes a first cell and a second cell. The first cell can include a first anode (503) and a first cathode (504), wound in a first jellyroll assembly (501) with a first jellyroll assembly exterior defined by the first cathode. The second cell can include a second anode (512) and a second cathode (513), wound in a second jellyroll assembly (502) with a second jellyroll assembly exterior defined by the second anode. The first cell and the second cell can be arranged in a housing with the first jellyroll assembly exterior adjacent to the second jellyroll assembly exterior to improve energy density. The first cell assembly and the second cell assembly can have different widths to create differently shaped cell assemblies.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOOGLE TECHNOLOGY HOLDINGS LLC1600 AMPHITHEATRE PARKWAY MOUNTAIN VIEW CA 94043

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hallmark, Jerald Sugar Hill, US 1 11
Howard, Jason Alpharetta, US 38 143
Maleki, Hossein Duluth, US 18 191

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00