Chip substrate and chip package module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865787
SERIAL NO

14931432

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A chip substrate includes conductive portions, insulation portions, cavities and a heat dissipating portion. The insulation portions are alternately bonded to the conductive portions to electrically isolate the conductive portions. The lens insertion portions are formed on an upper surface of the chip substrate at a predetermined depth so as to extend across each of the insulation portions. Each of the lens insertion portions includes a predetermined number of straight sides and a predetermined number of arc-shaped corners formed in regions where the straight sides meet with each other. The cavities are formed inward of the lens insertion portions at a predetermined depth so as to extend across each of the insulation portions. The heat dissipating portion is bonded to a lower surface of the chip substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POINT ENGINEERING CO LTD89 ASANVALLEY-RO DUNPO-MYEON ASAN-SI CHUNGCHEONGNAM-DO 31409

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Bum Mo Suwon-si, KR 162 241
Park, Seung Ho Hwaseong-si, KR 185 355

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00