Semiconductor device including oxide layer surrounding oxide semiconductor layer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865743
SERIAL NO

14053919

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Oxygen is likely to be released or an oxygen vacancy is likely to occur during a manufacturing process particularly at a side surface of an oxide semiconductor layer. When an oxygen vacancy occurs at the side surface of the oxide semiconductor layer, a problem arises in that the resistance of the side surface is reduced, the apparent threshold voltage of a transistor varies, and variation in the threshold voltage is increased. Further, the variation in the threshold voltage may cause unintentional current to flow between a source and a drain, which might lead to an increase in the off-state current of the transistor and deterioration in the electric characteristics of the transistor. A semiconductor device in which a multilayer film including an oxide semiconductor layer and an oxide layer surrounding the oxide semiconductor layer is used for a channel formation region is provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR ENERGY LABORATORY CO LTDJAPAN'S KANAGAWA PREFECTURE ATSUGI CITY ATSUGI-SHI KANAGAWA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yamazaki, Shunpei Tokyo, JP 7534 239327

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00