Semiconductor device and manufacturing method for the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10079307
APP PUB NO 20150108478A1
SERIAL NO

14585953

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object is to provide a method for manufacturing a highly reliable semiconductor device including thin film transistors which have stable electric characteristics and are formed using an oxide semiconductor. A method for manufacturing a semiconductor device includes the steps of: forming an oxide semiconductor film over a gate electrode with a gate insulating film interposed between the oxide semiconductor film and the gate electrode, over an insulating surface; forming a first conductive film including at least one of titanium, molybdenum, and tungsten, over the oxide semiconductor film; forming a second conductive film including a metal having lower electronegativity than hydrogen, over the first conductive film; forming a source electrode and a drain electrode by etching of the first conductive film and the second conductive film; and forming an insulating film in contact with the oxide semiconductor film, over the oxide semiconductor film, the source electrode, and the drain electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR ENERGY LABORATORY CO LTDKANAGAWA KANAGAWA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akimoto, Kengo Atsugi, JP 440 44355
Sakata, Junichiro Atsugi, JP 462 14332
Yamazaki, Shunpei Setagaya, JP 7526 239327

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00