Replacement metal gate structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865739
SERIAL NO

15582973

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Replacement metal gate structures with improved chamfered workfunction metal and self-aligned contact and methods of manufacture are provided. The method includes forming a replacement metal gate structure in a dielectric material. The replacement metal gate structure is formed with a lower spacer and an upper spacer above the lower spacer. The upper spacer having material is different than material of the lower spacer. The method further includes forming a self-aligned contact adjacent to the replacement metal gate structure by patterning an opening within the dielectric material and filling the opening with contact material. The upper spacer prevents shorting with the contact material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Basker, Veeraraghavan S Schenectady, US 494 4609
Cheng, Kangguo Schenectady, US 3099 32749
Standaert, Theodorus E Clifton Park, US 304 2822
Wang, Junli Singerlands, US 527 3181

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00