Semiconductor device and method of manufacturing semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865604
SERIAL NO

15277723

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device having a high degree of freedom of layout has a first part AR1, in which a plurality of p-type wells PW and n-type wells NW are alternately arranged to be adjacent to each other along an X-axis direction. A common power feeding region (ARP2) for the plurality of wells PW is arranged on one side so as to interpose the AR1 in a Y-axis direction, and a common power feeding region (ARN2) for the plurality of wells NW is arranged on the other side. In the power feeding region (ARP2) for the PW wells, a p+-type power-feeding diffusion layer P+(DFW) having an elongate shape extending in the X-axis direction is formed. A plurality of gate layers GT extending in the X-axis direction to cross the boundary between the PW and NW wells are arranged in the AR1, and a plurality of MIS transistors are correspondingly formed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RENESAS ELECTRONICS CORPORATIONTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shibata, Ken Kanagawa, JP 33 383
Yanagitani, Yuta Kanagawa, JP 6 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00