Robust through-silicon-via structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865523
SERIAL NO

14158577

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and apparatus entailing an interconnect structure comprising interconnect features disposed in dielectric material over a substrate. Each interconnect feature comprises an interconnect member and a via extending between the interconnect member and a conductive member formed within the dielectric material. A through-silicon-via (TSV) structure is formed laterally offset from the interconnect structure by forming a first portion of the TSV structure with a first conductive material and forming a second portion of the TSV structure with a second conductive material. Forming the second portion of the TSV structure occurs substantially simultaneously with forming one of the interconnect features.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN SEMICONDUCTOR MANUFACTURING COMPANYNO 8 LI-HSIN RD 6 SCIENCE-BASED INDUSTRIAL PARK HSIN-CHU 300-77

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiou, Wen-Chih Zhunan Township, TW 414 9438
Lin, Yung-Chi Su-Lin, TW 99 1736
Wu, Tsang-Jiuh Hsin-Chu, TW 112 1253

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00