Nitride film formed by plasma-enhanced and thermal atomic layer deposition process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865455
SERIAL NO

15258789

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are methods and apparatuses for depositing a nitride film using one or more plasma-enhanced atomic layer deposition cycles and one or more thermal atomic layer deposition cycles in a single reactor. The number of thermal atomic layer deposition cycles can be equal to or greater than the number of plasma-enhanced atomic layer deposition cycles. Incorporation of thermal atomic layer deposition cycles with plasma-enhanced atomic layer deposition cycles can allow for greater fine-tuning of properties of the nitride film. In some implementations, the nitride film is a silicon nitride film. The silicon nitride film can be fine-tuned to allow for a more silicon-rich film with a greater refractive index. In some implementations, the plasma-enhanced atomic layer deposition cycles and the thermal atomic layer deposition cycles can be maintained at the same wafer temperature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LAM RESEARCH CORPORATION4650 CUSHING PARKWAY FREMONT CA 94538

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kelchner, Kathryn Merced Portland, US 5 658
Sims, James Samuel Tigard, US 5 725

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00