High-performance supercapacitors based on metal nanowire yarns

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865404
SERIAL NO

14839499

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy-storage device is formed from a first and a second yarn, each yarn including a plurality of nanowires including aluminum and/or a transition metal. An anode pad is in contact with the first yarn and a cathode pad is in contact with the second yarn. Alternatively, first and second metallic electrodes may be disposed substantially in parallel, with pluralities of nanowires including aluminum and/or a transition metal extending therefrom. In another embodiment, a supercapacitor may include a niobium yarn including a plurality of niobium nanowires. Each niobium nanowire may include at least (i) a first section comprising at least one of unoxidized niobium and niobium oxide; (ii) a second section comprises a niobium pentoxide layer; and (iii) a third section comprises a layer formed by coating the niobium nanowire in at least one of a conductive polymer and a liquid metal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MASSACHUSETTS INSTITUTE OF TECHNOLOGY77 MASSACHUSETTS AVENUE CAMBRIDGE MA 02139

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hunter, Ian W Lincoln, US 159 6623
Mirvakili, Seyed M Vancouver, CA 7 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00