Method of manufacturing capacitor including intermediate dielectric layer with first internal electrodes and second internal electrodes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865396
SERIAL NO

14932258

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A capacitor includes: dielectric layers including a first dielectric layer, a second dielectric layer, and at least one intermediate dielectric layer laminated between the first dielectric layer and the second dielectric layer; first interlayer electrode and second interlayer electrode arranged alternately with each other between at least two layers among the dielectric layers; a first external electrode disposed on lateral surfaces of the dielectric layers and coupled to the first interlayer electrode; and a second external electrode disposed on lateral surfaces of the dielectric layers and coupled to the second interlayer electrode, wherein the intermediate dielectric layer includes first internal electrodes coupled to the first interlayer electrode, arranged in a plane direction of the intermediate dielectric layer and spaced apart from each other, and second internal electrodes coupled to the second interlayer electrode, arranged alternately with the first internal electrodes and spaced apart from the first internal electrodes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJITSU LIMITED1-1 KAMIKODANAKA 4-CHOME NAKAHARA-KU KAWASAKI-SHI KANAGAWA 211-8588

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Itoh, Masayuki Kawasaki, JP 108 450
Nakashima, Tomokazu Kawasaki, JP 15 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00