Memory devices with reduced operational energy in phase change material and methods of operation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865339
SERIAL NO

14850662

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods of forming and operating phase change memory devices include adjusting an activation energy barrier between a metastable phase and a stable phase of a phase change material in a memory cell. In some embodiments, the activation energy barrier is adjusted by applying stress to the phase change material in the memory cell. Memory devices include a phase change memory cell and a material, structure, or device for applying stress to the phase change material in the memory cell. In some embodiments, a piezoelectric device may be used to apply stress to the phase change material. In additional embodiments, a material having a thermal expansion coefficient greater than that of the phase change material may be positioned to apply stress to the phase change material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
U S BANK NATIONAL ASSOCIATION AS COLLATERAL AGENT633 WEST FIFTH STREET 24TH FLOOR LOS ANGELES CA 90071

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meade, Roy E Boise, US 42 438

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00