Amplifier

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865331
SERIAL NO

14710653

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A circuit includes a plurality of first circuits, a selection circuit, and a second circuit. The selection circuit is configured to selectively couple a first circuit of the plurality of first circuits with the second circuit. The first circuit includes a first data line and a second data line; and a pair of cross-coupled transistors of a first type coupled with the first data line and the second data line. The second circuit includes a first switching circuit and a second switching circuit; and a pair of cross coupled transistors of a second type different from the first type. The pair of cross-coupled transistors of the first circuit and the pair of cross-coupled transistors of the second circuit are configured as part of a sense amplifier when the first switching circuit and the second switching circuit are turned on.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY LTDHSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tayal, Mayank Ottawa, CA 9 166

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00