Operation instruction generating circuit and consumable chip

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865314
SERIAL NO

15528925

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An operation instruction generating circuit and a consumable chip. The operation instruction generating circuit includes: a power-on initialization module, connected to a signal wire and used for generating an initialization signal according to a signal transmitted by the signal wire; a middle signal generating module, connected to the power-on initialization module and the signal wire and used for combining, according to the initialization signal, the signal transmitted by the signal wire to generate a middle signal; and an instruction generating module, connected to the power-on initialization module and the middle signal generating module and used for generating an operation instruction according to the initialization signal and the middle signal or according to the initialization signal, the middle signal, and the signal transmitted by the signal wire. By the operation instruction generating circuit, the consumable chip is enabled to accurately respond to actions of a printing imaging device in time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GEEHY MICROELECTRONICS INC7/F BUILDING 04 NO 63 MINGZHUBEI ROAD XIANGZHOU DISTRICT ZHUHAI GUANGDONG 519075

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sun, Wanli Guangdong, CN 8 23
Wang, Xiongwei Guangdong, CN 16 28
Xue, Ruyan Guangdong, CN 2 0
Yang, Huiling Guangdong, CN 8 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00