Voltage regulation circuit and liquid crystal display comprising the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865221
SERIAL NO

14890168

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A voltage regulation circuit is provided, including a reverse processing module for processing a first initial voltage of a common voltage generating module so as to obtain a reverse voltage of AC voltage; and an integration module for regulating the first initial voltage according to the reverse voltage of the AC voltage so as to make a liquid crystal drive voltage equal to a preset value. The liquid crystal drive voltage is a difference value of between a second initial voltage and the first initial voltage which is regulated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN CHINA STAR OPTOELECTRONICS TECHNOLOGY CO LTDNO 9-2 TANGMING RD GUANGMING NEW DISTRICT SHENZHEN GUANGDONG 518132
WUHAN CHINA STAR OPTOELECTRONICS TECHNOLOGY CO LTDBUILDING C5 BIOLAKE OF OPTICS VALLEY NO 666 GAOXIN AVENUE EAST LAKE HIGH-TECH DEVELOPMENT ZONE WUHAN HUBEI 430079

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Man Guangdong, CN 91 987
Tan, Xiaoping Guangdong, CN 70 150
Xing, Zhenzhou Guangdong, CN 56 103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00