Minimum suggested rate picking

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9864962
SERIAL NO

14089296

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pick rate planning system is utilized to determine pick rates needed for the picking of items in a materials handling facility. Critical pull times (“CPTs”) are determined which indicate times by which items must be picked from inventory. Multiple pick rates that overlap in time are made to have an overall total pick rate that is relatively constant, so as to avoid spikes or other undesirable fluctuations in the overall total pick rate, which improves labor planning. Pick rates for later CPTs are designated as being for that CPT or any earlier CPTs, and all of the pick rates are designated as minimum suggested pick rates. These designations provide the picking scheduler with greater flexibility that results in higher pick density and productivity.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMAZON TECHNOLOGIES INCPO BOX 81226 SEATTLE WA 98108-1226

International Classification(s)

loading....
  • 2013 Application Filing Year
  • G06Q Class
  • 9604 Applications Filed
  • 6937 Patents Issued To-Date
  • 72.24 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20132014201520162017201820192020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lehmann, Sebastian Seattle, US 30 481
Madan, Udit Seattle, US 16 252

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 1 Citation Count
  • G06Q Class
  • 30.77 % this patent is cited more than
  • 7 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges243984301 - 1011 - 2021 - 3031 - 4002.557.51012.51517.52022.52527.53032.53537.54042.5

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029