Multilayer substrate, design method of multilayer substrate, manufacturing method of semiconductor device, and recording medium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9864829
SERIAL NO

14847479

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, there is provided a multilayer substrate including a ground layer and a signal layer. The ground layer includes a mesh ground having multiple openings. The signal layer is laid above the ground layer and including multiple signal lines. The multiple openings include first openings and second openings. The first openings overlap a first signal line from among the multiple signal lines when seen through in a direction perpendicular to a surface of the multilayer substrate. The second openings overlap the first signal line when seen through in the direction perpendicular to the surface of the multilayer substrate. The first openings have a first form, and the second openings have a second form different from the first form.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIOXIA CORPORATION1-21 SHIBAURA 3-CHOME MINATO-KU TOKYO 108-0023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuchi, Satoru Chigasaki, JP 14 26
Iida, Yoshihiro Minato, JP 52 2445

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00