Cascaded fieldbus system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9864721
SERIAL NO

14438674

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

For simplified projection of a cascaded fieldbus system which includes a first fieldbus with a plurality of first bus devices, a second fieldbus subordinate to the first fieldbus with a plurality of second bus devices and a third fieldbus subordinate to the second fieldbus with a plurality of third bus devices, an example embodiment of the invention provides that the second fieldbus is connected to the first fieldbus via a fieldbus access node device, and therefore bus devices of the second fieldbus are presented as virtual modules of the first fieldbus, and that a connection device, via which the third fieldbus is connected to the second fieldbus, is presented as a virtual fieldbus access node module of the first fieldbus, and therefore the remaining bus devices of the third fieldbus are presented as virtual modules of the first fieldbus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS AKTIENGESELLSCHAFTWERNER-VON-SIEMENS-STRASSE 1 MUENCHEN 80333

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Greiner-Jacob, Ralf Egloffstein, DE 1 3
Seeburg, Harald Ursensollen, DE 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00