Bus system using plurality of non-overlapping frequency bands for communication

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9864715
SERIAL NO

14346494

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a bus system for transmitting data between data processing units in a network, by means of a bus that consists of two signal lines. The signals at said bus are analog signals which lie within a plurality of non-overlapping frequency bands assigned to the individual data processing units, and these data processing units use a digital communication protocol to communicate with a signal processor unit that comprises a polyphase filter bank, a D/A Converter and a bus-coupling unit being connected downstream of said bank in order to couple the data signal into the bus in a galvanically-isolated manner. The proposed bus system has a simple design with regard to cabling, allows the use of a Standard communication protocol such as Ethernet for the data processing units, and additionally allows data to be transmitted between all network subscribers simultaneously and without restriction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRBUS DEFENCE AND SPACE GMBHWILLY-MESSERSCHMITT-STRASSE 1 TAUFKIRCHEN 82024

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heller, Christoph Taufkirchen, DE 11 49
Schalk, Josef Altheim, DE 12 184

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00