Peripheral device complying with SDIO standard and method for managing SDIO command

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9864521
SERIAL NO

14586824

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a method of managing SDIO commands at a host device and a peripheral device. The host device connected to the peripheral device by a bus comprising a command transmission line and a data transmission line, both of which are arranged to transmit single end signal. The host device converts operation requests into converted commands and combines a first SDIO complied data packet with the converted commands to generate a first combined data packet. Then, the host device transmits the first combined data packet through the data transmission line, wherein the first combined data packet comprises a first header for indicating whether the first combined data packet comprises the converted commands. After receiving the first combined data packet, the peripheral device parses the first combined data packet to obtain the converted commands, and then performs processing procedures according to the converted commands.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEDIATEK INCNO 1 DUSING RD 1ST SCIENCE-BASED INDUSTRIAL PARK HSIN-CHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hu, Chao-Yu Miaoli County, TW 5 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00