Embedded clock in a communication system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9864398
SERIAL NO

14983776

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for transmitting a plurality of data bits and a clock signal on a return to zero (RZ) signal includes: transmitting a first voltage that is greater than a first threshold, the first voltage being decodable to first order of data bits; transmitting a second voltage that is between a second threshold and the first threshold, the second voltage being decodable to a second order of data bits; transmitting a third voltage that is between a third threshold and a fourth threshold, the third voltage being decodable to a third order of data bits; transmitting a fourth voltage that is greater in magnitude than the fourth threshold, the fourth voltage being decodable to a fourth order of data bits; and transitioning the clock signal in response to the RZ signal being between the second threshold and the third threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXAS INSTRUMENTS INCORPORATED12500 TI BOULEVARD MS 3999 DALLAS TX 75243

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Payne, Robert Floyd Lucas, US 45 1777

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00