Slice I/O—field power bus breaker

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9864352
APP PUB NO 20160349721A1
SERIAL NO

14726805

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An input/output (I/O) device for an automation control system includes a device housing containing control circuitry, the device housing being mountable to a support, a control power input for receiving control power from a first adjacent I/O device when connected thereto, the control power input configured to supply control power to the control circuitry, a control power output for outputting control power to a second associated adjacent I/O device, a field power input for receiving field power from the first associated adjacent I/O device when connected thereto, and a field power output for transmitting field power to the second associated I/O device. The field power input is selectively removable to prevent field power from being received by the I/O device from the first associated adjacent I/O device when connected thereto.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROCKWELL AUTOMATION ASIA PACIFIC BUSINESS CTR PTE LTDSINGAPORE 618494

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kang, Soon Seng Singapore, SG 13 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00