Optical component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9864155
SERIAL NO

14849362

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical component includes: a first substrate, a second substrate, and a transfer board. A first electrically conductive path is disposed on a top surface of the first substrate. A second electrically conductive path is disposed on a bottom surface of the first substrate. A third electrically conductive path is disposed on a top surface of the second substrate. A microstrip line structure is disposed on the transfer board. The microstrip line structure includes a transfer line disposed on a top surface of the transfer board. The top surface of the second substrate is opposite to the bottom surface of the first substrate, where the second electrically conductive path fits the third electrically conductive path. The transfer board is disposed on the top of the top surface of the second substrate. One end of the transfer line is electrically connected to the first electrically conductive path by a wire bonding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HISENSE BROADBAND MULTIMEDIA TECHNOLOGIES CO LTDNO 218 QIANWANGANG ROAD ECONOMIC AND TECHNICAL DEVELOPMENT ZONE QINGDAO SHANDONG 266555
HISENSE USA CORP7310 MCGINNIS FERRY ROAD SUWANEE GA 30024
HISENSE INTERNATIONAL CO LTDNO 218 QIANWANGANG ROAD ECONOMIC AND TECHNICAL DEVELOPMENT ZONE QINGDAO SHANDONG 266555

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, YongLiang Shandong, CN 17 16
Mu, Hongwei Shandong, CN 7 18
Wang, Hao Shandong, CN 906 6386
Zhang, Shun Shandong, CN 138 141

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00