Sintered body comprising a plurality of materials and pressure measuring instrument comprising such a sintered body

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9863831
SERIAL NO

14779582

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sintered body comprises a first region which comprises a first material having a first effective coefficient of thermal expansion α1, a second region which comprises a second material having a second effective coefficient of thermal expansion α2, a transition region between the first region and the second region in which the effective coefficient of thermal expansion changes from the first effective coefficient of thermal expansion to the second effective coefficient of thermal expansion. The transition region has a sequence of layers with a mixture of at least the first material and the second material, with the mixing ratio of the layers varying in order to achieve a stepwise, in particular monotonic, change in the coefficient of thermal expansion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENDRESS + HAUSER GMBH + CO KGHAUPTSTRASSE 1 MAULBURG 79689

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rossberg, Andreas Bad Sackingen, DE 44 245
Schmidt, Elke Bad Sackingen, DE 40 266
Tham, Anh Tuan Berlin, DE 27 78

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00