Barrel-type multistage pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9863427
SERIAL NO

14747423

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A barrel-type multistage pump with uniformed velocity distribution in an axial direction, on a cross-section of a rotating flow channel, to suppress fluid loss in a last stage, and including: plural stages of centrifugal impellers, covered by an inner casing; diffusers and return channels provided on downstream sides of the centrifugal impellers, to guide the flow of a fluid to a centrifugal impeller in the next stage, and return vanes arranged at respective return channels; a cylindrical outer casing having a suction pipe and a discharge pipe, wherein a cylindrical rotating flow channel connected to a discharge opening is provided between an outer casing and an inner casing, a connecting channel to connect between a rotating flow channel and diffusers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI LTDTOKYO TOKYO METROPOLIS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagahara, Takahide Abiko, JP 5 35
Torii, Daichi Tsukuba, JP 3 9
Yoshida, Tetsuya Tsuchiura, JP 156 762

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00