Carbon dioxide capture interface for power generation facilities

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9863281
SERIAL NO

14962559

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a power generation facility (10) wherein a fluidized bed combustion unit (12) produces steam to power a steam turbine generator (32), a heat recovery steam generator (20) produces steam for the steam turbine generator. Electrical power from the steam turbine generator is conducted to a motor (40) that drives and air compressor (36). The air compressor provides pressurized air back to the fluidized bed combustion unit (12) to promote fuel combustion. Flue gas from the heat recovery steam generator is selectively conducted to a CO2 capture unit (18) and then to a gas expander (42) that assists the motor in driving the air compressor (36). A heat exchanger (46) that is upstream of the CO2 Capture Unit and a heat exchanger (56) that is downstream of the CO2 Capture Unit and upstream of the air expander have thermal fluid sides that are connected in a closed circuit. The heat exchangers (46 and 56) convey heat away from the CO2 Capture Unit and provide heat to flue gas flowing to the gas expander to avoid icing conditions in the gas expander and acid condensation in the air emission stack.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POLVI ESKO OLAVINot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Polvi, Esko Olavi Bonita Springs, US 2 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00