Steel pipe socket and method of connecting steel pipe pile and steel pipe column using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9863113
SERIAL NO

14369573

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steel pipe pile and a steel pipe column is connected using a steel pipe socket. The connection method may include preparing the steel pipe socket including a socket supporting portion that covers an upper end surface of the steel pipe pile, and inserting a plurality of socket insertion portions extended downward from the socket supporting portion and having a plurality of socket grooves at a lower end portion thereof and a plurality of fastening members installed on the socket supporting portion. The method may also include inserting the socket grooves of the steel pipe socket into an upper end portion of the steel pipe pile and mounting the steel pipe column on the socket supporting portion. The method may further include fastening the steel pipe column and the steel pipe pile using the plurality of fastening members of the socket supporting portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RESEARCH INSTITUTE OF INDUSTRIAL SCIENCE & TECHNOLOGY67 CHEONGAM-RO NAM-GU GYEONGSANGBUK-DO POHANG-SI 37673
POSCO CO LTDGYEONGSANGBUK-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Dae Yong Seoul, KR 16 108

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00