Use of a catalyst comprising a phosphorous modified zeolite in an alcohol dehydration process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9862653
SERIAL NO

14236726

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A catalyst can be used to convert an alcohol in a dehydration process into an olefin having the same number of carbon atoms as the alcohol. The catalyst can include a phosphorus modified zeolite made by providing a zeolite with at least one ten member ring in the structure, steaming the zeolite, mixing the zeolite with binders and shaping additives, and shaping the zeolite. An ion-exchange step can be performed, and the shaped catalyst can be steamed. Phosphorus can be introduced on the catalyst at an amount of at least 0.1 wt %, such as by dry impregnation or chemical vapor deposition. A metal can be introduced. The catalyst can be washed and/or calcinated, and steamed in an equilibration step. The steaming severity (X) can be at least about 2. The catalyst can be steamed at a temperature above 625° C., such as a temperature ranging from 700 to 800° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IFP ENERGIES NOUVELLESFRANCE RUEZ - MA MAISON L V E MA MAI SONG UPPER SEINE PROVINCE
TOTAL RESEARCH & TECHNOLOGY FELUY7181 SENEFFE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adam, Cindy Wierde, BE 34 118
Dath, Jean-Pierre Beloeil, BE 93 671
Euzen, Patrick Paris, FR 45 663
Lopez, Joseph Saint Julien les Rosiers, FR 22 134
Minoux, Delphine Nivelles, BE 86 277
Nesterenko, Nikolai Nivelles, BE 112 255

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00