Control device and non-transitory computer-readable medium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9862211
SERIAL NO

15362051

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device of a printing execution mechanism executing: first control processing including: conveying a sheet to a first position at which the sheet is held by an upstream holding member of the conveyance mechanism, is not held by a downstream holding member of the conveyance mechanism, and a downstream end of the sheet is located between the upstream and downstream holding members; and printing on a first surface of the sheet; and second control processing including: conveying the sheet to a second position at which the sheet is held by the upstream holding member, is not held by the downstream holding member, and the downstream end of the sheet is located at a more upstream side than the downstream end of the sheet located at the first position; and printing on a second surface of the sheet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BROTHER KOGYO KABUSHIKI KAISHA15-1 NAESHIRO-CHO MIZUHO-KU NAGOYA 467-8561

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yoshida, Yasunari Aichi-ken, JP 95 650

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00